2024 California High Speed ​​Rail (fertiggestellte Abschnitte in GRÜN) – 10 Jahre Bauzeit

Von Any_Time_312

12 Comments

  1. cornonthekopp on

    The [lucidstew](https://youtube.com/@lucidstew) youtube channel has a great 3 part overview of the current construction efforts where he goes on a roadtrip along the entire route and gives us dash cam video of all the construction and future construction happening.

  2. aliteralgarbagehuman on

    Some of us are colorblind. But I went to the comments cause I know none of it is complete.

  3. drainthoughts on

    Bring it up North and hit Portland Seattle and Vancouver. Time for the west coast to stake out our own path.

  4. The SCMaglev in Japan might go into service before California can even finish the environment reviews.

  5. NewMolasses247 on

    It took my city, Spokane, almost four full years and $18,519,557 to replace a 333-foot bridge.

    Four full years.

  6. r/truedetective

    Entire plot driver of season 2. I didn’t know it was a real plan.

  7. Commentariot on

    Very excited for this – looking forward to the wailing and nashing of teeth from the oil bros.

  8. elcheapodeluxe on

    I was in my 30’s when construction started and I do not expect to be able to travel San Jose – Los Angeles by HSR in my lifetime.

Leave A Reply