Tags
Aktuelle Nachrichten
America
Aus Aller Welt
Breaking News
Canada
DE
Deutsch
Deutschsprechenden
Europa
Europe
Global News
Internationale Nachrichten aus aller Welt
Japan
Japan News
Kanada
Karte
Konflikt
Korea
Krieg in der Ukraine
Latest news
Nachrichten
News
News Japan
Russischer Überfall auf die Ukraine seit 2022
Science
South Korea
Ukraine
Ukraine War Video Report
UkraineWarVideoReport
Ukrainian Conflict
UkrainianConflict
United Kingdom
United States
United States of America
US
USA
USA Politics
Vereinigte Königreich Großbritannien und Nordirland
Vereinigtes Königreich
Welt
Welt-Nachrichten
Weltnachrichten
Wissenschaft
World
World News
37 Comments
Here’s a summary of the key points from the report:
1. Initial Projected Cost:
Initially estimated at €200,000 per residential unit.
By June 2024, the average projected cost increased to around €436,000, a rise of nearly 120%.
2. Current Projections:
The Department of Children, Equality, Disability, Integration, and Youth projected total costs of €289.3 million.
This indicates a final estimated average cost per unit of approximately €442,000.
3. Fluctuations in Units:
Originally, 500 modular units were planned.
This increased to 700 units in July 2023, then scaled back to 654 units by July 2024.
4. Project Delays:
The original completion date was February 2023.
The new projected completion date is now April 2025.
5. Pilot Project:
The project began in response to the Russian invasion of Ukraine to provide rapid-build modular accommodation.
The Office of Public Works (OPW) developed a proposal for 500 modular units across 20 sites, with a budget of €100 million (€200,000 per unit).
The pilot program was approved by the government in June 2022.
6. Cost Increases:
By January 2023, the cost per unit had risen to €310,000 (a 55% increase).
Costs increased further due to site development issues and abnormal conditions.
In January 2023, the OPW estimated the cost of delivering 700 units at €237 million (€339,000 per unit), 70% higher than the original estimate.
7. Lack of Formal Approval:
Formal approval for revised costs and outputs was not obtained from the government until July 2023, months after the OPW instructed the main contractor to acquire more units.
The Department of Public Expenditure sanctioned the increased expenditure in September 2023.
8. Multiple Revisions:
Between July 2023 and January 2024, the estimated program delivery cost was revised four times.
Amazon has container houses for 25K (plus 5.50 for delivery) and they are in stock……
![gif](giphy|3cLKI5XB6kvwNSdVJ2|downsized)
Corruption here, corruption there, nothing new.
So building modular homes for more the cost of a normal house
Even 200k is a crazy cost for whats basically a chalet.. You would get better log cabins for 30k
Double it is a joke. 450k for a portacabin.
Man this country is a joke
The Mayor of Limerick is talking about putting a load of these onto state land to ease the crisis, someone’s going to make a fortune.
OPW hits it out of the park once again. Just when you think they can’t possibly top their previous performance, they pull this out of the bag.
My bedroom house in maynooth cost 425k start of the year. What is going on
The cost of these units wasn’t down to corruption from what I’ve heard. More like standard grade incompetence.
Firstly, a lot of these modular homes were built on the shittest building sites that councils had available around the country. The government said to councils – hand over a site, we need it for this project. The local councils handed over the worst sites they had with drainage issues, on the side of hills, overrun with knotweed, lacking existing sewarage or electrical hookups etc. So the cost of bringing the sites up to speed were FAR higher than a normal site would be, and far higher than the original budgets contained.
Secondly, the idea of modular homes is that you have some experienced factories churning out these units and every unit is identical. Then it’s extremely predictable for the construction workers on site to install them. All units should be identical. The work of building these units was farmed out to MANY different small places around the country who built a few units each. The units were not identical or built to a high standard. Some of the places went bust halfway through the project. This caused a nightmare on site with an explosion of costs as things had to be fixed and reworked.
Who runs the OPW
Like I mean there are two initial responses.
Firstly and just to be clear I am speaking figuratively not literally heads need to roll regarding the contractors that did the estimates and the officials/bureaucrats who reviewed, monitored and approved the project.
By and large the state cannot handle infrastructure and capital projects.
There is just too much corruption or incompetence or to be honest a bit of both.
It seems like ‘value for money’ is too much to ask for.
The bare minimum I’m looking for now is that these are used as planned for “beneficiaries of **temporary** protection” and not just re-purposed as very expensive long term social housing.
(We offer 90 days accomm for the updated rules but you have to be legally resident in Ireland long term to get on the housing list, which people here on temp protection are not).
At the very least that might stop the govt rolling over expensive hotel contracts for that purpose.
Absolute joke, where are the planning exempt modular homes for the Irish? I have no issue helping the Ukrainians, but helping them more than we help our own is disgraceful.
So these “low cost” modular homes are temporary until the war is over and once the Ukrainian situation is fixed we’ll be able to hand these low cost homes over to Irish people, students, the homeless, right, right??
Modern Ireland will eat itself. The greed is just endless
They walk over this this government and we just shrug and say it can’t be helped
OPW management needs to be completely and utterly gutted. So much mismanagement has been reported lately one can only assume this has been going on for years.
Public audit needs to be done with hyper focus on the public procurement department.
4 people steeltech shed based house with bathroom, kitchenette insulation costs around 25-30k. As far as I know they can literally manufacture them on a production line.
They are not a fully fledged houses, but I saw some council houses built recently and they are pretty close.
As a reminder – we are talking about temporary, 90 day housing. Considering the 442k is a price including a groundwork and utilities, and calculating those cover around 50% of the final price, it’s still 250k vs 442k for a 4 people temporary accomodation unit.
Recently built social houses for 4 people consists of 2 bedrooms, 1 living room, 1 kitchen and 1 bathroom, total living space 44m². Cost of the building – 230k, not including groundwork.
Steeltech modular house costs just under 30k for the same size.
I suppose the obvious definitional point is that if modular housing was decent quality, cheaper and faster than “normal” housing we probably wouldn’t be calling it “modular” housing, it would just be the way most housing is built nowadays.
Instead of providing arms to Ukraine we are housing them en masse, despite our chronic housing and health services and upsetting the less well off in this country.
I saw 2 bed container homes which were actually really nice for I think, 60k euro, for sale at the ploughing. Yeah electricity and sewage probably on top of that but still….
This is a fucking joke, taxpayer getting ripped off AGAIN
Why can’t we have competent opposition so we could get some fucking accountability.
Irish taxpayer defrauded again…. something must change
Larger modular homes than these are manufactured, delivered, built and finished inside in Northern Ireland for £94,000. Where the fuck are they buying these?
Did refugees modular home construction in Mahon Point, Cork, it was 120k per home in late 2022, but the cost of services, pipelines, roads comes alone with it I didn’t know
Ok im done!!
The show “Yes Minister” seems to be a rule book in the OPW – it’s simply unbelievable and this kind of lack of accountability must be all over – I spoke with a person over the weekend and they said on the children’s hospital they listed “galvanised stainless steel” as a requirement and the people providing it were coming in from the uk by plane and laughing about it (Irish lads) because they knew they hadn’t a notion so they whacked the prices way up – it’s crazy really – we spent a billion on hotels in the first half of the year on asylum seekers – we are going to be bankrupt v soon as this rate as a country – if not already …
A lot of useless cunts making decisions in this country. Taxpayer is getting rode.
Another children’s hospital in the making. Get this corrupt government out
A 120% increase is not a small discrepancy. Is it actually possible for anyone in the OPW to lose their jobs?
Imagine being that far off with cost projections in the private sector 😳
It’s seems we are not good at our sums.
Must be nice being Ukrainian? Not being fascist towards them but they seem to get a lot of stuff ahead of the tax payer, I’m at my wits end here in my 30’s in my old parents box room, seems bizzare this
Christ the amount of dodgy goings on with procurement using public funds.
What the fuck is happening lads. That Apple windfall will dissappear into thin air if this keeps up.
My sister built.one in her garden for her son and his girlfriend. Cost was €28k fully finished.
I’ll ask her how much she charges for consultation and forward her number on to those who throw tax payers money around like confetti
I am so tired. I work hard, I live with my Dad because I cannot afford to buy a house nor find anywhere to rent that is within a distance to allow my kid to go to school and for me to get to work on time. My kid is autistic so “changing school” just isn’t feasible (I’ve looked, believe me) and trying to change job isn’t exactly easy either. The cost of everything except my wages is rising. Our housing is in shambles, our education system is a mess and our health system is at breaking point and now I am told that a glorified prefab costs almost half a million to make. I don’t vote FF/FG but it never changes. Lads, what is the actual point anymore?
Bin the OPW